DESIGNWORKS Vol38
18/36
Works16敷地は川崎駅前の市役所通りと旧東海道の交差点に面するかつての川崎宿本陣があった場所である。歴史性を考慮し、技術継承により成立する職人手作業による研ぎ出し磨き仕上げと次世代オフィスビルとしての機能を融合させる外装システムを計画した。建物コア内に制震デバイス減衰コマを配置、外殻柱の3.6mモジュールの扁平柱と大梁をピン接合し面外水平力を伝えないことで600×300mmの小径を可能とした。この小径扁平柱を内包する形状となる奥行450mmの外壁Pcaを製作し、各スパン毎に空調設備システムを完結させた。構造と設備を解決するPCa板は呼吸する外装となり、30×10mの整形なオフィス空間を実現した。(高橋 健人)川崎室町ビルKawasaki-Muromachi BuildingOwner: Muromachi Building Co.,Ltd.Location: Kawasaki-shi, Kanagawa Main Use: Office, BankDesign: Takenaka Corporation·Architects: Noboru Sakou, Takehito Takahashi, Yumiko Matsubara, and Yota Houkibara·Structural: Yutaka Ide, Hiroki Nakayama, and Masafumi Yanada·M&E: Kouji Tanaka and Hiroki KawakamiConstruction work: Takenaka Corporation, Imanishi Gumi, and Muromachi Building·Site manager: Yoshimitsu MaedaSite area: 781.35m2Building area: 645.89m2Total floor area: 6,917.45m2Construction: SteelNumber of stories: 11 floors above ground,1 penthouse floor, and 1 basement floorConstruction term: May 2015 to November 2016建築主:室町建物株式会社所在地:神奈川県川崎市主要用途:事務所・銀行店舗設計:竹中工務店・設計:酒向昇・高橋健人・松原祐美子 伯耆原洋太・構造:井出豊・中山裕貴・梁田真史・設備:田中宏治・川上大樹施工:竹中・今西・室ビルJV・作業所長:前田義光敷地面積:781.35㎡建築面積:645.89㎡延床面積:6,917.45㎡構造:S造階数:地下1階 地上11階 塔屋1階工期:2015.5~2016.11TYPICAL FLOOR PLAN S=1:600The location of this building, at the intersection of Shiyakusho-dori in front of Kawasaki Station and the former Tokkaido rail line, is the former site of the inn for high-ranking officials located at Kawasaki-juku, one of the 53 stations of the Tokkaido. In recognition of its historical importance, an exterior system that combined the hand-grinding and hand-polishing of artisans (made possible by the passing on of expertise from one generation to the next) with the functions of a next-generation office building was employed. Attenuation compartments for damping devices were provided within the building core, and the 3.6 m flat columns of the outer shell were connected to the large beams with pins to prevent out-of-plane horizontal force from being transmitted, enabling a small diameter of 600 x 300 mm. Outer wall precast concrete panels with a depth of 450 mm were fabricated in a shape that encloses these small diameter flat columns, and an air conditioning system for each span was provided. The precast concrete panels that connect the structure and equipment serve as the exterior that provides ventilation, resulting in a 30 x 10 m regularly shaped office space. (Takehito Takahashi)市役所通り側外観121.EVホール EV Hall2.執務室 OfficeOuter frame fused with structural equipment構造設備を融合したアウトフレームNN21
元のページ
../index.html#18