DESIGNWORKS_62号
16/36

11123Works建築主:第一生命保険所在地:北海道札幌市主要用途:事務所・物販店舗・飲食店舗設計:竹中工務店施工:竹中・岩田地崎・伊藤建設共同企業体・設計:高嶋一穂・千賀順・千葉拓也・構造:金田崇興・大澤祐介・山崎僚平・設備:田島大介・川幡祥太・総括作業所長:中山文雄地上の札幌駅前通と、札幌駅と大通公園を結ぶ札幌地下の大動脈「チ・カ・ホ」 に直結するオフィスビル。地上と地下の分断をまちの課題と捉え、交差点に面して吹抜けを設け、階段とスキップフロア状の滞留空間を連続させたオープンスペースとした。外周には商業テナントを配置し、地上と地下のレベル差6.5mを視線と動線をゆるやかにつなぐことで、地上と地下双方の賑わいを結ぶ地域に開かれた広場空間となることを目指した。(千葉 拓也 + 千賀 順)14・作業所長:武田力敷地面積:1265.64㎡建築面積:1167.24㎡延床面積:15760.02㎡構造:S造・SRC造・RC造階数:地下1階 地上13階 塔屋1階工期:2021.12〜2023.5SECTION S=1:300Owner: The Dai-ichi Life Insurance Company LimitedLocation: Sapporo-shi, HokkaidoMain Use: Office, Shop, RestaurantDesign: Takenaka CorporationConstruction: Takenaka-Iwata Chizaki-Itogumi Construction JV·Architects: Kazuho Takashima, Sunao Chiga and Takuya Chiba·Structural: Takaoki Kaneda, Yusuke Osawa and Ryohei Yamazaki ·M&E: Daisuke Tajima, Shouta Kawahata·Chief of Site manager: Fumio Nakayama札幌駅前通チ・カ・ホ地下と地上のあいだをゆるやかにつなぐGently connected below-ground and above-ground spacesThis office building is connected directly to both Sapporo Ekimae-dori at ground level and the underground walkway (Chikaho) that links Sapporo Station with Odori Park. The designers viewed the disjuncture between ground level and underground spaces as a community issue that needed to be resolved, and provided an atrium facing the intersection as an open space connecting the stairs and the skipped-floor type spaces that encourage people to spend time. Commercial tenants are placed around the periphery, and gentle visual lines and movement routes link the above-ground and below-ground spaces across the 6.5m level difference. The aim was to achieve a plaza environment that is open to the community and links the vibrancy of below-ground and above-ground spaces. (Takuya Chiba, Sunao Chiga)1.オフィス Office2.オープンスペース Open Space3.店舗 Shop ·Site manager: Chikara TakedaSite area: 1265.64m2Building area: 1167.24m2Total floor area: 15760.02m2Construction: Steel, Steel Reinforced Concrete, ReinforcedConcreteNumber of stories: 13 floors above ground, 1 basement floor and 1 penthouse floorConstruction term: December 2021 to May 2023D-LIFEPLACE 札幌D-LIFEPLACE SAPPORO

元のページ  ../index.html#16

このブックを見る